VER-05 · OEM verification domain

EV journey and charging

Prove vehicle-aware energy decisions while keeping BMS truth, prediction, charger evidence and physical charging separate.

Ten paths—including ambiguity, loss, replay and recovery.

The vehicle program turns each scenario into versioned test cases with routes, fixtures, conditions, thresholds and accountable verdicts.

  1. 01

    missing or invalid SoC and energy signals

  2. 02

    climate, elevation and traffic sensitivity

  3. 03

    vehicle and battery degradation

  4. 04

    charger incompatibility and exclusion

  5. 05

    unavailable or stale charger evidence

  6. 06

    skipped charge stop

  7. 07

    route deviation and dynamic replanning

  8. 08

    arrival SoC and reserve policy

  9. 09

    charging-plan reproducibility

  10. 10

    handoff to cockpit and companion

Every participant retains its own authority and release evidence.

Green results in one participant do not promote another product—or a physical outcome—to accepted.

Verify behavior at the handoff, not only inside the component.

Open each contract to freeze authority, compatibility, degradation and prohibited outcome claims.

A verdict stays reproducible, attributable and reviewable.

These fields travel together so a screenshot or summary cannot become disconnected from its exact conditions.

01

versioned test definition and acceptance threshold

02

fixture, route, data and environment provenance

03

raw result plus summarized verdict

04

defect, deviation and retest disposition

05

product, schema, content, policy and configuration versions

06

independent review and accountable approval

07

target, laboratory, vehicle or operational evidence where required

OEM program workshop

Plan ev journey and charging evidence for the exact vehicle.

Allocate scenarios, targets, versions, fixtures, thresholds, review and acceptance before declaring readiness.