Developer hub/Products/AIS-140 / Fleet Tracker
Hardware system · integration blueprint

Build with AIS-140 / Fleet Tracker.

Program-specific electronics plus firmware, vehicle/harness/RF/mechanical ICD, manufacturing and managed cloud lifecycle. This page defines the public integration shape; exact endpoints, artifacts, signals, electronics, entitlement and release versions are program-specific.

Start with authority, context and capability.

The device is authoritative for its measured health and identity; approved vehicle interfaces remain authoritative for vehicle state and action.

Modules6

Scopeable capability groups

Interfaces4

Adjacent integration domains

Delivery3

Program-selectable forms

Guardrails3

Evidence boundaries

Interfaces a production program must own.

Names describe the contract boundary. Current Mappls documentation and the signed OEM interface schedule remain authoritative for exact methods and formats.

01

Vehicle ICD

Power, wake, buses, signals, commands, connector, harness, load and failure behavior.

02

Device protocol

Provisioning, identity, telemetry, downlink, diagnostics, configuration and update state.

03

Manufacturing

SKU/BOM/version, secure identity injection, EOL limits, traceability and vehicle binding.

04

Lifecycle/service

Health, certificates, firmware/configuration, replacement, recovery, warranty and decommission.

From scope to supported release.

01

Select SKU

Freeze vehicle, territory, networks, interfaces, workloads, environment, certification and volumes.

02

EVT

Prove electronics, firmware, secure identity, cloud and early vehicle operation.

03

DVT

Prove electrical/environmental/RF/EMC/security, HMI and full lifecycle against requirements.

04

PVT & SOP

Prove manufacturing capability, EOL/traceability, approvals, pilot fleet, service and change control.

Carry the evidence with the value.

The example is illustrative and intentionally product-neutral. It demonstrates version, freshness, quality and correlation behavior that remains stable across Mappls Auto domains.

  • InTouch/Connected Vehicle Cloud
  • Vehicle ignition/IO/CAN by selected model
  • Cellular/SIM and GNSS antenna
  • OEM/fleet installation, service and operations
device-manifest.yaml
deviceId: tcu-sim-78a1
hardwareRevision: rev-c
bootVersion: 2.4.1
firmwareVersion: 4.9.0
configurationVersion: oem-my27-6
certificateGeneration: 7
health:
  state: healthy
  observedAt: 2026-08-18T04:42:18Z

Use source-controlled contracts and generated clients for the selected release.

Turn scope into traceable interfaces.

Each enabled module receives a requirement, owner, contract, test environment, operational measure and lifecycle decision.

01

Location & movement

GNSS position, heading, speed, time and configured reporting.

Contract · Test · Operate
02

Vehicle events

Ignition, tamper, digital/analog IO and optional CAN signals.

Contract · Test · Operate
03

Connectivity

Cellular upload, buffering, retry and dual-profile options by product.

Contract · Test · Operate
04

Alerts

Generate or relay movement, geofence, speed, panic and health events.

Contract · Test · Operate
05

Device health

Monitor power, battery, antenna, network, storage and firmware.

Contract · Test · Operate
06

Lifecycle

Provision, configure, update, diagnose, replace and decommission.

Contract · Test · Operate

Validate the failure path—not only the first success.

Production readiness is attached to the chosen platform, territory, data, vehicle, deployment and lifecycle.

  • Electrical transient, EMC/ESD and power-state behavior
  • Thermal, vibration, environmental and mechanical
  • RF/GNSS/operator/antenna vehicle performance
  • Secure provisioning, boot, credentials and update recovery
  • Manufacturing EOL, traceability and process capability
  • Vehicle, field pilot, service and warranty feedback
OEM program workshop

Move AIS-140 / Fleet Tracker from blueprint to integration plan.

Confirm the vehicle, users, territory, source systems, contracts, deployment, lifecycle and evidence. The result becomes a focused technical workshop.